What I should have asked was is it OK to split the ground wire "responsibilities" between the chasis and a wire so as to enable
use of a smaller wire gauge.
If I roll with the 75/15 and put a 15 amp breaker ahead of the MPPT then don't need to worry about the panels generating more than that? Or does the MPPT have that breaker already?
If I roll with the 75/15 and put a 15 amp breaker ahead of the MPPT then don't need to worry about the panels generating more than that? Or does the MPPT have that breaker already?
@9780LC - Could you share part numbers for the parts in the picture where the wire comes up to the truck? Specifically to plug and, outlet and cover. Those look great!