40Wanted

Location
The Woodlands, TX
Gender
Male

Signature

Aug 1976 FJ40 project -- Rust removal/repair stage

Parts waiting to be installed:
Real Steel rear cargo pan, CCOT rear sill & cover, BudBuilt 3/16" thick rear 1/4's stretched 14" over stock, tubing for rear frame stretch, Barnes4x4 rear 4 link kit, rebuilt Cummins 4bt, NV4500 transmission, Dana 300, Dodge Dana 60 front, 14 bolt rear axle, j**p J20 Saginaw power steering box...

Trophies

  1. 0

    15-year Aniversary

    15 years of forum membership - Thank You!
  2. 0

    5-year Anniversary

    Thank you for being with us for 5 years!
  3. 0

    10-year Aniversary

    Thank you for 10 years of forum membership!
Back
Top Bottom