Been a while since I posted - busy with summer projects, but the LC continues to progress slowly.
Since the rig was sitting, I decided to get the 5 wheels addressed. Powder-coat, new shoes, new lug nuts, and new center caps:
My hopes of trailering the rig somewhere for body and paint prior to installing the drivetrain are officially dashed. Having a really tough time finding someone to take on the project and when I do get some positive response, there is a long lead-time.
No worries - plenty of other work to do. Went ahead and cleaned/painted the engine bay and the focus is now to get the drivetrain in.
Building the engine has been fun and satisfying. Been referencing lots of MUD posts and YouTube videos.
Currently waiting on the valve cover from the powder coater and the injectors from witch hunter.
The valve buckets got mixed up (by me), so the clearances didn't check out when we to got the cams in, so I had to order a few new shims. Upon second installation of the cams with the updated shims, all clearances are now in spec.