Slider rails finished, finer liners in, dual batteries/trays installed, radiator, washer reservoir, washer linkage and steering tied to gear box.
Routing air intake to drivers side. Once SMOG is complete will make an air box behind DS battery.
Got ideas on the overflow tank from radiator and the charcoal canister bracket on PS fender well. Fuse block bracket PS fender, ARB compressor PS fender.
Monday I'll start on the steering column, brake booster and master. Start cleaning up the donor dash getting linkage for the TC shifter designed.
Ordered more little pieces, 4" silicone coupler, EVAP purge and vent valve, trans dip stick, overflow tank, radiator cap, etc..
Pic on Monday
J