Here is the situation. I am working on our 80 UTE project. For those not reading that thread, the basics are that we are making a 80 into a pickup truck. As part of this, we added 9" to the frame to make it longer. This additional 9" is the same place the gas tank is, so my thought was to cut and weld two tanks together, to make it 9" longer with only one welded seam. This should add maybe 5 gallons of capacity, as it is at the tall part of the tank, which is very needed on an 80. Also the input and output to the tank would not be effected then by the added frame dimension.
This all sounds great until you hear about gas tanks exploding while trying to weld them together. Even sitting out empty and airing out for years.
After reading on the internet, my plan was to cut them both down to diminsions, pressure wash them, maybe take them to a machine shop and have hot cleaned, then prep for welding.
Get a car exhaust pipe routed to the tank and have it pump in C0 the entire time we are welding the tank together.
So, the question is: Should I do this, or is this crazy? And any other recommendations?
paging @SuperBuickGuy
This all sounds great until you hear about gas tanks exploding while trying to weld them together. Even sitting out empty and airing out for years.
After reading on the internet, my plan was to cut them both down to diminsions, pressure wash them, maybe take them to a machine shop and have hot cleaned, then prep for welding.
Get a car exhaust pipe routed to the tank and have it pump in C0 the entire time we are welding the tank together.
So, the question is: Should I do this, or is this crazy? And any other recommendations?
paging @SuperBuickGuy
Last edited: