- Thread starter
- #121
Ok, so need to be ready for the Moose to make a 700 mile round trip around the end of April. The clutch and driveshafts will be sorted for sure. It runs good now and I might put a sniper swap on the back burner if time allows.
Aside from getting the signals and lights sorted out, what other items should I be looking at. Thinking the front disc swap should be on the hit list, maybe some soundproofing and heat sheild on the floor, what else? Got some time, but with other projects and honey-it's it will be here before I know it.
Thanks
Aside from getting the signals and lights sorted out, what other items should I be looking at. Thinking the front disc swap should be on the hit list, maybe some soundproofing and heat sheild on the floor, what else? Got some time, but with other projects and honey-it's it will be here before I know it.
Thanks
Last edited:
springs, but it is done.
The drivers side lense is in pretty good shape, but the one pictured is pretty jacked up. The left side is busted pretty bad.