My New Rear Bumper

This site may earn a commission from merchant affiliate
links, including eBay, Amazon, Skimlinks, and others.

Install party at someone's house perhaps ????
 
I would be happy to get all together for an install party and help get them all on but you guys are setting up an install party and I don't even have them built yet. :doh: :D
 
I would be happy to get all together for an install party and help get them all on but you guys are setting up an install party and I don't even have them built yet. :doh: :D

Well hurry up! ;p

I'm in for install party.
 
Talk about putting the cart in front of the horse..... :deadhorse:
 
:lol::lol:
 
Ok all. Finally :rolleyes: got all of the drawing done and will send it to the laser shop tomorrow. I need a deposit of $500 from all parties that want a bumper, single or dual swingout. The price will be as previously set at $1,600 for a single swing out and $2,000 for a dual. If there is alot of work in setting up what you want on the second swingout there may be an extra charge. I will work with you and we can figure that out as applicable. I can take Paypal or a check but there will be a 3% charge for Paypal. PM or email me your info or for an address to send the check to.

Email: slomo33@cox.net

Paypal: slomo33@cox.net


Yes I know they are the same. :flipoff2:


I am starting the actual build process and am hoping to get them done in 8-10 weeks. This may seem like a long time but the process takes alot longer on an initial run when working out the bugs. They will not be on the side, when I can find time, when I feel like it etc., they will officially be in the shop rotation. I will do everything in my power to get them done at that timeline or before but there is a possibility that they will take longer. You are forewarned. :D

Post up if you have any questions I haven't answered.
 
How does February look? :flipoff2:
 
I am in Mo!
:bounce: :bounce2: :bounce: :bounce2: :bounce: :bounce2:
Can i drop of the $$$ when i pickup my rack ? Is that cool?
Also, i will PM you with some questions re: the bumper. Thanks!
 
Will a light be included for the license plate? Or is that something we will have to source ourselves?


I will be happy to include one with it but you will obviously be in charge of wiring it. I will also be putting a light mounting tab on the swing out/s.


I am in Mo!
:bounce: :bounce2: :bounce: :bounce2: :bounce: :bounce2:
Can i drop of the $$$ when i pickup my rack ? Is that cool?
Also, i will PM you with some questions re: the bumper. Thanks!


Not a problem Sean. Fire the questions whenever you like.
 
I will be happy to include one with it but you will obviously be in charge of wiring it.
Not a problem, was just wondering to know if I should start sourcing a light or not. Thanks!

I will also be putting a light mounting tab on the swing out/s.
Nice! Was actually going to ask you about this! :clap:
 
I know what I want for Christmas!:D

I'm in for a single swingout - plus the other MO-difications we talked about.

I need to come by and checkout the plan!
 
The price will be as previously set at $1,600 for a single swing out and $2,000 for a dual. If there is alot of work in setting up what you want on the second swingout there may be an extra charge. I will work with you and we can figure that out as applicable.

You should name yourself Bumper King (Make it your way!) :grinpimp:
 
I know what I want for Christmas!:D

I'm in for a single swingout - plus the other MO-difications we talked about.

I need to come by and checkout the plan!



Sounds good. Let me know when.



You should name yourself Bumper King (Make it your way!) :grinpimp:


LOL, I don't mind personalizing to an extent. But within reason. ;)
 
Hey, Mo. I need to get your Addy. I want to mail the $ and save 3%. I was also wondering if you had worked something out for a Ladder. Let me know when you can.

Thanks, Charles
 
Hey, Mo. I need to get your Addy. I want to mail the $ and save 3%. I was also wondering if you had worked something out for a Ladder. Let me know when you can.

Thanks, Charles


I emailed you the address, sorry for the delay. I can do the ladder but I need to see the extend of work involved to set pricing for it. I will post up on that as soon as I can.
 

Users who are viewing this thread

Back
Top Bottom