So, how's the sleep and spare time going for you? 3 months in?
Hopefully you're getting lots of landcruiser thinking /planning time in the early hours at least...
Haha, sleep is actually good. But time... What a luxury good.
There actually happened some things. I got delivered a tub. 3500 Euros it cost me. And i sent it right back. What terrible work. I attached some images. I cant spend so much money on this and then have a tub which has rusty welds. And the overall work is quite crappy i think. Whenever a panel was needed they just welded it on top. So there are so many spots which will rot away in the futher...
So i ordered a new tub from teseven... Very Expensive but i think it lasts and quality is good i heard.
Some progress was made on the welding part of the spring hangers.
Currently im putting together a big order list for spectre offroad, springs, headliner, break kits, break lines. Soon i order them.
My plan:
- Weld Frame
- Get frame blasted/cleaned and then powder coated
- Remove all windows, only doors are left...
- Sandblast rusty parts
- Weld rusty parts
- Redo breaks
Then i have to see how far the tub is. Because i need to fiddle the doors in to the new tub and i want to make sure it fits.
Currently i still have the same uncertainties. I dont know if swiss gov allows me to use bolts instead of rivets... I have all the tools for rivets but id rather use stainless bolts and have them over the powder coated frame. I think that would help rust prevention. But its like a federal thing. We have cantons which are like states and they all say something different.
And im a bit hesitant to do the frame repairs myself as i have no welding licence and i read that its needed for frame welding of cars... Swiss is damn hard in my opinion... So i need to wait there on someone willing to do it for me.
Thanks guys for participating. Makes this way easier!