Extended the FJ60 steering shaft using 3/4 solid stock and 3/4 ID tubing to sleeve the connections. Then used a 3 1/2 ID 1/8 wall pipe section to notch the ford shock tower.

extended%20steering%20shaft_zps05txcpc1.jpg


ford%20tower%20modified_zps27mdwezz.jpg


time%20to%20burn%20it%20in_zpsbuoyqv02.jpg
 
  • Like
Reactions: SMG
FJ60 steering box is in and done. The FJ60 tilt steering column is in. I cut off the mounting ears on it and left enough to keep the spring retainers for the tilt mechanism.

I am ecstatic about where the wheel sits at full up tilt with the seat all the way back. In the future I will fab up a cover for the exposed part of the column.

20160302_202028_zps526vgpns.jpg



20160302_201708_zpsp0b3mpeq.jpg


20160302_201524_zpsoj4z8dlc.jpg


20160302_201234_zpsmt0jxr3n.jpg
 
It has been awhile, maybe I will update this when I get home from work....
 
This is how it sits now. I pulled the tub off to make the T-Case X-member, route the exhaust, fab in the new S-10 blazer fuel tank, and do the drive shafts.

pulled the tub.jpg
 
Exhaust is going to be challenging. I have a plan for the S-10 fuel tank, it required me to move the upper shock mount forward 3 inches.

exhaust is going to be fun.jpg


fuel tank.jpg


upper shock mount moved forward.jpg
 
Hahahha, so much has changed since August....

tree link.jpg
 
Progress

20170108_153430_001.jpg


20170108_153444.jpg


20170108_164029.jpg
 
Time to figure shock tower height I suppose. Then test it all and start welding it all together.

work 1.jpg


work.jpg
 
  • Like
Reactions: SMG
The axle side is almost complete. Figuring bump stops and limiting straps. Considering putting the bump stop on the frame and having it limit the link up travel. Not sure that will force droop on the other side though like I want. For edification the links are 1/4 inch wall, plenty strong. Frame side I need to remove tac welds to get to the rivets on the bottom of the frame and remove those so I can get a nice flush mount on those brackets. At that point the 3-link will be done and I can put the tub back on.

link.jpg


linkylinky.jpg


linkylinky2.jpg
 
JB Fab cable shifters going in. Had to make my own brackets for the 86 Split case. I trimmed and cleaned it up a bit since the pic, its been painted and installed. Tub goes back on this weekend

JBFab Shifter.jpg
 
suppose I will figure the bumper out when the tub is on and I have to trim the body panels.

rear.jpg
 
Progress.

20170225_180510.jpg
 