I got power energized today and even temporarily connected the two receptacles that are installed so that I could break out the corded tools to cut in the last two boxes. I love my cordless tools but there's no comparison when you need a heavy duty drill, for example.
When I took measurements for power, I estimated something like 125' to the house where the power and water to the shop exited, 10' at the Cook Shed itself, and another 110'+ under the house to the two exterior panels. I bought a 250' roll of 10/2 UF and started at the Cook Shed so that if I had to make a splice it would be as simple as nailing in a junction box under the house. Well I will chalk this one up to luck, regardless of how much I think of my estimating prowess. 2' +/- to spare. Nice.
I have had my two family decorators involved with fans and lighting over the last couple of weeks (wife and daughter). I eventually ordered and hung two damp rated, builder grade Hunter, 52" ceiling fans. Wanted to go with the original Hunters but didn't think the $500+ difference per fan was worth the expense for the Cook Shed. Used 5' rods which puts the fan blades just over 9' high. FWIW, everything I read said not to mount ceiling fans in an outdoor setting higher than ~9' or the breeze effect will be minimized. I haven't wired these up yet but the CFM to FT2 ratio looks good with two of them. Time will tell.
Consensus on lighting is to have 8 pendants of some ilk. I have one sample in hand and we are waiting on an alternative to be delivered. Trying to stay towards the low end of the spectrum as it really adds up when you multiply by 8. I am also adding some additional area lighting off of two adjacent trees. We currently have area lighting for the "lower lawn" in 3 trees which is operated by a switch from the shop. I am discarding one that's adjacent to the Cook Shed and adding two. So there will be two near the Cook Shed on a switch and two more between the Shop and the Cook Shed controlled from the shop......hopefully that all makes sense.
Daughter put the ixnay on my string of cafe lights around the eaves of the Cook Shed - bummer. I'm installing a switched outlet on the plate beam anyway....you never know when you might need some "Christmas lights". She has been duly forgiven though as she pulled her mother over to my side on the roofing material which was no easy feat. More on that subject later.
I really enjoy this stage of a major project. All the heavy lifting is done and we're down to the fine details. Also there tends to be less deadlines of the uncontrollable like, have to finish "X" before the rain hits, etc. I don't consider myself an electrician by any means but the fit out wiring is easy work and requires a bit of creativity to make the runs as obscure as possible; both are within my limited electrical capabilities. Estimating I will have everything done and the lights on permanently in another few days. That assumption is premised on finding a pendant we can all agree on. At that point I can get some CMU, brick, mortar, and sand ordered so that we can move on to the reason we built the Cook Shed in the first place.