So after the PM is caught up on (really never) what is the order of upgrades? I have all this stuff that I want to do but I'm not sure what order to do it in. Right now I have a box of parts from Beno sitting in my garage but I need my wife to hurry up and have her garage sale so I can get the cruiser in there and get to work. Here's what I have planned for PM right now:
1. Valve cover gasket
2. Spark Plug Tube Gaskets
3. Dizzy O-ring
4. Front Main Seal
5. Oil pump cover seal
6. PS pump rebuild
7. Silicon PHH
8. Oil Pan FIPG
Future PM
1. Fix AC (soon, Should be Cheap)
2. Front axle rebuild (when doing regear) Brakes front a rear at the same time. Looking at Jonesy’s rebuild kit
3. Bang dent out of tail gate
I’ve already replaced the belts, PCV Hose, grommet and valve, as wells as other odds and ends. I’ll be getting up under the truck to check the u-joints and all the other stuff under the truck while it’s in the garage. Currently I’m looking for some cheap 285 AT’s to slap on the truck for now. As far as Upgrades I’m in the middle of replacing the speakers right now and I’ve installed an AOE front bumper. I have a lot of stuff sitting around but I’m not sure what order to do it. Here’s the order of operations I have planned out right now.
1. Deflare, Derack, Destep fill holes (weld) and paint (for now)
2. Insulation while interior is out (
http://www.lobucrod.com/)
3. Monstaline two tone Burnt Orange and White (Flashy I know but who cares, Hook ‘Em)
4. Reroute exhaust over the frame the way nature intended. Will have to add CARB compliant front cat as the one on there isn’t legal and smog tech warned me that it may not pass in a couple years if someone else does it. (PRK is beautiful but is ran by morons)
5. Sliders (Metal Tech or OPOR) and Skid Plate (BIOR)
6. Dual swing out 4x4 labs Bumper with Buddy made tire carrier and Jerry Can Rack.
7. Dual Batteries (have a lot of stuff. Does anyone have pics of the Slee bracket? I have some aluminum just sitting in my garage that I can bend up at work) Have 12volt guy dual batt and winch panel but need to find a place to put it.
8. Winch (Engo 12K synthetic line) may install sooner but I want to wait until the 2nd battery is in.
9. OBA- I have the York and all the stuff I need except a tank.
10. Rear storage. My buddy is a cabinet maker and can do this in CAD and with a CNC to cut all the pieces.
11. Weigh the truck and get good numbers and call Slee about a 4 inch lift that will work with all the weight. May add a roof rack if I find the right one later but I don’t think the weight will matter much.
12. After lift take 3rd members out and send them off for 4.88’s
13. Add some 35’s and call it a day
I’m hoping to have most, if not all, of this stuff done by the end of the year. Do any of you think this is out of order or is there anything else that I should take care of? I have more PM to do along the way as I get to different parts of the build. I think all of these things should give me a great rig in the end. There will be some small electrical upgrades along the way as well for lights and what not.