- Thread starter
- #281
Finished welded the seat mounts. Then painted them, the seat belt anchors, and tool box lid.
Most of the top to tub bolt holes did not line up, so I made new ones and will install nut serts in the rub rail.
Most of the top to tub bolt holes did not line up, so I made new ones and will install nut serts in the rub rail.
