- Thread starter
- #181
1:37pm
3.5 hours including lunch. AC disconnect was the hardest part.
3.5 hours including lunch. AC disconnect was the hardest part.
Last edited:
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
This site may earn a commission from merchant affiliate
links, including eBay, Amazon, Skimlinks, and others.
A lift. A shop. Must be nice...
I can only zone off into space and imagine how nice it must be....
What is stock angle from the back radius bolt to the center of the axle tube?
Hah! True that!A lift. A shop. Must be nice...
Here is the problem. 80 coil buckets and 55 rear cargo area.
Im familiar with that threadCheck out the Surf Wagon thread
Not looking forward to that..
What? Next week??? Looks like you could have it done tomorrow!
And LUNCH!!! If you didn't take LUNCH you'd be doneA lift. A shop. Must be nice...
Nice work man, you are getting busy.-Thursday
Measure, cut, measure, cut, measure, measure, grind, ratchet strap, cut, strap, weld
cut 5.5” out of 80 frame to get wheel base to match 55+ 1/2”. Moves front axle forward a little.