OK got a little more done on the firewall tonight. Definitely taking my time as usual, but got a little more than half done. I am waiting for a drill press a friend is bringing down on sat before I start doing serious work on drilling the holes and building the drivers side piece, which be semi complicated, probably take close to a night to build that one piece...

Anyway, started cutting the ~4" strip to go next to the piece I tacked in.. Then removed it, all welded up...
SM_Picture 002.webp
SM_Picture 004.webp
SM_Picture 005.webp
 
Next, tacked and started welding in..

With the .030 wire I can use the high and low settings now. Still, very hard on the lowest setting to not burn through the very thin OEM Toyota steel.. As a results, welds look crappy but are ground down now so doesn't really matter...
SM_Picture 009.webp
SM_Picture 010.webp
SM_Picture 013.webp
 
First pic shows a previous photo. I don't think this would have been an issue but it could have as its close.. So I cut out as shown so the new design will make it cut at about there the white line is...

I cut at the lower line... Again all this is with cut off wheels...
SM_Picture 055 copy.webp
SM_Picture 016.webp
SM_Picture 019.webp
 
LOL.. Cut out the piece for the driver side tonight out of pretty thick 14 gauge.. Got a lot of stuff RE mounting the pedal assembly to the new firewall.. But helped my buddy with the Isuzu start tearing out his stuck cyl sleeve (nightmare).. Anyway should have some progress on that side soon I think!

Cheers Noah :beer: :flipoff2:
 
OK more updates..

I forgot my camera last week so no pics. I basically cut out the piece for the driver's site and finessed so it fits perfectly (lots of small trimming, etc...)

I used 14 gauge which is pretty thick for this piece, because there will be a lot of stress with the pedals constantly against it. Stock metal is paper thin but there are pressed ribs into the steel to strengthen it. Mine won't have this so the extra width comensates...


I knew this piece would take a while, spent all night on it tonight.. Again a little slow but I am pretty happy with overall quality of it..

First I wanted to say how much I love my welder..! I always turn off the gas at the end of the night. Last time I used it was last week, but it still holds the same pressure for over a week :)
SM_Picture 002.webp
 
From tracing of old firewall, I figured out where masters should go...


But ** I screwed up ** -- I spent a lot of time last week figuring out where to place the clutch master. I knew the brake master is fine because I used this master last time (would have liked to actually move up a hair, make the brake pedal **less** responsive because hydroboost is so powerful.. ) But I wanted to move the clutch master down 1" so I would get longer pedal throw to compensate for the different Dodge/Cummins clutch master.. But I forgot until after I drilled the hole. And I had so much time in this piece I didn't want to start over... I did figure out a solution though that will work fine..

Anyway, here are pics of figuring out where everything goes. Marked, drilled pilots, then the hole saws..
SM_Picture 010.webp
SM_Picture 012.webp
SM_Picture 013.webp
 
Last edited:
Forgot to mention...

Finally got a drill press, borrowing from my friend Bill who is doing the Isuzu rebuild in the shop.. Helped a lot for tonight particularly as I wanted to make sure the holes in the firewall are super clean.. It is easy to mess up holes with a hand drill when using hole saws...
SM_Picture 007.webp
SM_Picture 008.webp
 
Next started indexing for holes for bolts on brake master (hydroboost)...

The top of the piece is not level so I had to figure out what was level and mark.. That is what the first pic is, markings to make sure level...

Next had to eyeball hole to make sure fit.. In the end I screwed this up a little...
SM_Picture 014.webp
SM_Picture 017.webp
SM_Picture 020.webp
 
This is my technique for forgetting to move the clutch master down an inch.. Move the pedals up about 1/2" and back about 1.25". This actually makes the throw of the pedals more like a truck (probably not too necessary) but will let me get the throw I'll need to actuate the clutch...

This unit is the pedal assembly that houses the pedals...
SM_Picture 036.webp
 
Next started working on hole for the passenger side vent.. My last pig (71) didn't have a vent. Some I have seen with foot vents on both sides.. Anyway, I want to reuse so I cut hole for that.. Traced pattern and put in new hardware...

Bottom of second pic shows the hole for the steering shaft.. Instead of reusing (the black tracing), I decided to fab up whole new one that will be non-removable and a single, cleaner, hole... (the blue line shows the tracing)...
SM_Picture 037.webp
SM_Picture 039.webp
SM_Picture 042.webp
 