ASFIR Skid plates and front bumper

This site may earn a commission from merchant affiliate
links, including eBay, Amazon, Skimlinks, and others.

I had to order the bolts too. Part # 90119-08862


When did you order yours?
Ordered mine like the 7th of May. Just installed mine today and it fit great. The only issue I ran into was the center bolt was way to short, being it had a 1/4 of skid to go through the threads didn’t want to engage. Picked up a longer bolt and called it a day

EF7BB47A-871B-4D83-8286-30063DEB5046.webp


1F13AF1E-5AB0-446B-B939-7EC85173971A.webp
 
I bet it was a shipping loophole. They are a small business and the website has some update stuff that they do only when pointed out. Example I asked abpuy a fuel skid + bumper on a pallet. They looked up shipping on the fuel skid and in doing so changes it from like $40 to 'price quote'.
 
@AFei did you ever hear anything back from the company ? I’m wanting to order one as well and am curious about the shipping.

The auto-replay message from the company said it's the holiday until Sunday. So expect to hear back from them next week I gelieve.
 
Just received the email response from ASFIR, and they are on MUD now. @ASFIR 4X4 just create a new thread explaining it:
 
@ASFIR 4X4 customer service is top notch, wish they would make a gas tank skid for the us spec 100. ;);)
 
I would ask them if they are considering producing a batch for US customers non diesel 100 series. I know it's not impossible to make their current plates fit. I just would like the convenience of the bolt on option with little modifications. I have the front plate installed currently but want to buy the rest.
We are planning to manufacture the full underbody set for the LC100 petrol version, we'll keep you posted with the deatils!
 
I've heard rumblings of a US-specific skid set from Asfir in the works--can anyone verify or provide a timeline?
Hi there, sure can verify that. but there's still no specific timeline - we are in the midst of design and production phase. Hopefully no more than a few weeks away.

I let them use my LC for a scan a few weeks back now, I haven't heard much since then. I assume they are still in the design/testing phase before they manufacturer them.

Based on the timeline we discussed, I'm expecting to see something in the next 2-4 weeks.
Thank you my friend! We appreciate it very much. You'll hear back from us soon enough ;)
 
Great pictures!
With the Asfir plate being longer and having attachment holes at the rear end of the plate, does it require that holes be drilled in a frame crossmember to receive the bolts? If not, where are the pre-existing attachment holes for the rearmost bolts going through the plate?
HI! Our skids are made "bolt-on" so no drilling required!
 
How much did it cost you? Looks like the shipping cost increased a lot
View attachment 2320565
Yes, you are right. We have noticed a calculation problem on our website and this is the reason the shipping cost is more expansive now.

With that, we know a lot of you have been planning on getting the front one (at least until we have the rest for the perol 100 ;) ) so there's a promo-code MUDLOVE that will be valid through June 7th and after discount will get you to the price with 19$ shipping cost.
Please notich though, the promotion ends June 7th... see the attached top thread Change in shipping costs, asfir.com
 
Last edited:
It shows $58 shipping for me (89118) as well
Hi, please notice the top post of the thread here (Change in shipping costs, asfir.com) - it explains the increase in shipping cost and that we now have a coupon (MUDLOVE) at checkout that will get you to the price with 19$ shipping price. Please notice though it's valid through June 7th.

Best.
 
Last edited:
Back
Top Bottom