SUMMIT CRUISERS Jr
SILVER Star
- Thread starter
- #701
Update for everyone as I feel like this process has taken exponentially longer than I could have imagined:
Shop walls are up. I painted it all over several evenings this week. All 220 and 120 electrical has been run (need to install outlets and trim etc), 200A panel has been installed (which is now pending approval from the inspector so that’s the hold up at the moment. Once that’s approved, I’ll be headed back to OK over a weekend to pick up all of my swing out jigs, tools, etc. then I can jump into building work benches and diving into swing out stuff!
Shop walls are up. I painted it all over several evenings this week. All 220 and 120 electrical has been run (need to install outlets and trim etc), 200A panel has been installed (which is now pending approval from the inspector so that’s the hold up at the moment. Once that’s approved, I’ll be headed back to OK over a weekend to pick up all of my swing out jigs, tools, etc. then I can jump into building work benches and diving into swing out stuff!