- Joined
- Jan 18, 2007
- Threads
- 38
- Messages
- 585
- Thread starter
- #81
Alright, phase 2 is complete, phase 3 will bring a finished coating and tag and backup camera placement. The addition of the 4xinnovations swing out is the cherry on top. We used a wheel spacer to clear for the hi-lift and added a "bike rack" receiver on the swing arm.
Last edited: