- Thread starter
- #81
Plenty done today, intercooler radiator is complete
Here's a shot with everything almost finished. I'm just waiting for my injectors and a few other bits to turn up.
Just one fabrication job left and that will be making a new throttle/kickdown cable assembly. Based upon the original gear, just with an extended shaft using a 120' section of double pulley so the accelerator can pull one way and the kickdown will come from the other.
Sounds easy enough
The only unknown is whether the curve required for one is a mirror of the other - utilising a 1:1 pull. Sometimes these pulleys are curved slow to fast or fast to slow which is used to determine where the gears change/kickdown.
Here's a shot with everything almost finished. I'm just waiting for my injectors and a few other bits to turn up.
Just one fabrication job left and that will be making a new throttle/kickdown cable assembly. Based upon the original gear, just with an extended shaft using a 120' section of double pulley so the accelerator can pull one way and the kickdown will come from the other.
Sounds easy enough

The only unknown is whether the curve required for one is a mirror of the other - utilising a 1:1 pull. Sometimes these pulleys are curved slow to fast or fast to slow which is used to determine where the gears change/kickdown.
Last edited: