Pic 4: Mount the spindle to the knuckle housing. Torque all bolts to spec 11-16 ft lb. (Make sure to get the right spindle mated to the correct knuckle. )
Pic 5: Install the rod assembly minus the spring arm and tighten the nuts just enough to allow the rod to be turned. Pull the scribe forward and again rotate the rod to scribe the second line.
Pic 6: Remove the rod assembly. Do not disturb the scribed lines. Secure the rod in a vice or something else and carefully measure the distance between the two scribed lines. This is where you can get off a bit. Measure it twice then let your buddy measure it.

Write this down as measurement D.
Now to get the TOTAL shim thickness (both top and bottom shims added together)
Total shim thickness (Call it C) C = A - B Write this down.
To get the BOTTOM shim thickness
Bottom Shim (Call it E) E = D - 3mm
To get the top shim thickness
Top Shim (Call it F) F = C - E
Totally confusing I know. Just read the instructions a few times.