went to flat nasty friday, glad i got to meet clutchee, cowboy, fro, mike,woody, and the others.
thank you clutchee for bringing up the swampers.
so i got homw and thought i really need to finish up on this 40 so i can go wheel it.
here are just the couple things i got done today. motor is in, motor mounts are tacked to frame. i think i am going to find a 2wd oil pan as the 4wd one just doesnt sit well with me.
tranny is bolted to the motor and in. transfercase is close to the 40, waiting on the novak input shaft to arrive.
dismounted 2 of my old 325/60/15lts today. man did that suck. had to back my dually over the bead to get them broke down. got 2 swampers mounted. i think i am going to like these.
then i moved the front jack stands so that i can mount my lower links. i have to cut that tubular crossmember out as my output shaft on the transfer will hit it.
i disassembled the interior so that i can start on the cage.
the motor is sitting a little lower than i wanted, but with a flat belly pan/skid i should be fine. ill brace that up with some 2x2x.25 square to keep it off of things.
the upper links are going to be close to everything in the front. at full compress i have about 1-2 inch clearance. with a 2wd oil pan i should have more. at least i know when i compress it fully that nothing hits. then ill just make sure everything works fine at full droop. that way i can also measure and build for my shocks.
i think ill use 15 inch travel for the front and 12 in the back. the rear ones will be splayed in so they wont need to be nearly as long.
so ill see what i can accomplish tommorrow. this waiting for parts is driving me nuts!!!!