No, not happy with how it came out. I have the guts ripped out of the rig now and doing a bunch of other goodies: Killmat, Noico foam insulation, new carpet, new stereo, new steering wheel leather, rebuilt seat belts with webbing, new interior LED, new backup cam, new exterior LED lighting for back - front and sides, adding a switch pro, installing a witsend quarter panel for the electrical distribution, dual battery setup and changing to a hydro-boost brake system with a witsend power steering cooler, to name just a few items. I have a garage full of stuff I have been accumulating and need to get installed. As I get closer to reassembly, I am going to rethink my mounting method. The way things are going, this is going to take a few months to wrap up.
Here is where she sat a few weeks ago, I am done with the roof and some of the side for the killmat and noico foam as of the moment. Took me about 10 hours just cleaning before I could start the killmat!
View attachment 2551357