OK, I have gotten a good bit of work done over the weekend and still have tomorrow, labor day. That is what I plan to do... labor.
1. I got the passenger side quarter panel reinstalled with the patch panel. I have to do a little more welding and grinding, but it is 90% done.
2. Cut out the vent box in the cowl. This tub is older 75-76. I have the original cowl and there was not a vent so I am deleting this one. I will weld in a patch panel after I get it back from the media blaster.
3. Finished getting the sound deadner off the driver side floor.
What is left to do before media blasting???
1. I need to finish shaping the gas door opening.
2. I need to finish grinding and cleaning up the welds on the patch panels.
3. I need to clean up all the plug welds on the wheel wells.
4. A little more misc. clean up of welds, holes filled, etc.
I am hoping to finish it tomorrow... which probably means a couple more weeks