- Thread starter
- #41
Roger,
After the 7th, I have the 21st off with April 4th being the next off Friday. Figure what works for you and give a shout back. Thanks
We'll plan on the 21 st. Did manage to get the rear brakes adjusted today.
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
This site may earn a commission from merchant affiliate
links, including eBay, Amazon, Skimlinks, and others.
Roger,
After the 7th, I have the 21st off with April 4th being the next off Friday. Figure what works for you and give a shout back. Thanks
We'll plan on the 21 st. Did manage to get the rear brakes adjusted today.
Here are the work items for the 21 st, if we get them done, the beast will be mobile so I can get it out of the shop and work on my junk: hook up lines to brake booster, bleed brakes, install front drive shaft, pto shafts, install/ adjust pto and T-case linkage, install 8 tires and find and fix pwr steering leak. As you can see a bit much for just Larry and me, any volunteers?
A couple of other things I would like to get done before May, adjust bed so tail gate will work in both positions and clean and paint the truck, any painters in the group?
We are working friday
poor africans
saturday free