StinkySwine71

This site may earn a commission from merchant affiliate
links, including eBay, Amazon, Skimlinks, and others.

working on putting the PIG back together...
fj55rearview.webp
 
I put the 1500 lb. Superior Over Leaf Spring Assist on the driver side rear to correct the sagging on that side. Previous owner must have put a 2 in shackle. Works good on my PIG for 6 months now.
Yes, tires are 33x10.5 MT.
 
going to have to get the body hot for a long time before you paint it now...all that primer is soaking up the moisture and starting the rusting process again primer is very porous :frown:
 
Front driveshaft was fabritcated / installed and works good on 4WD and fun in the snow. Emergency brake was hooked up and the front heater. I'm working on the speedometer cable, since this PIG was converted from 3 speed to 4 speed. This is scheduled to the paint shop mid 3/13.
 
Monty,

Did you fix the rocker and rear corner or is the body shop going to handle all that. Must be a good feeling to be getting that close, to being finished.
 
Was able to find a speedometer and speedo cable from 74 PIG. I have a working speedometer now. I found some coolant leak under the front seat. Most likely heater hose.
 
Monty,

Questions: Are you getting the inside done, etc. I'm just trying to get an idea as to what they're charging to paint everything, these days.

It's going to look nice, man.
 
Thank you. Yes, everything inside(door jams, flooring, cargo area, inside of roof(before installing the new headliner)) will be painted Cygnus White. Painting is about 2K - 2.5K to include the bodywork needed.

When I bought this Pig, all parts were in boxes. I need picture of the dash knobs switches(below the rear glass switch)...

Thanks scrapdaddy
 
Back
Top Bottom