RFB
97 FZJ80 LIFTED SC DUAL BATTERIES,37s
Which is more important the "phasing" of the driveshaft yokes? or the "phasing" of the driveshaft flanges? Sorry to ask again, but the FSM isnt showing the DC driveshaft and the mounting bolts for the transfer case are very difficult to get to with the IP skid in place.