It depends on what you pay for the Taco shaft and how much your time is worth. If you can get one for under $50 and you have the free time, then the shortening/rebalancing puts you in the range of about $125-$150 total, but you still have the Taco joints, which may or may not be in good shape. If you have to replace the joints, you are now pushing the cost of just having a brand new shaft built without getting the heavier tube and all new parts.
On a tight budget, wihch applies here, it is worth it IMO to call some pick and pulls and see if you can't get one for about $25 and take your chance on the joints. You'd be at about $125 total plus your time.
For most of us, it is tough to justify the time spent plus risk on used joints vs. just calling Slee or visiting your local driveline shop if you have a good one. I have a great local shop and can get out the door on a brand new heavier tube shaft for ~$300 and about 30 minutes of my time using easily sourced Spicer joints. I just can't make a Taco shaft look better as a total project.
Nay