Been working on my front-end bearing this past weekend. All went fine with the valuable help of the FAQ and members advices. I am now ready to button 'er up and I have peered through numerous posts regarding the preload when I came across a couple of points.
- I am using the LandTank preload method, which seems to be favourable by many Mudders and stood the test of time/trail.
To recap it:
- The FSM says to torque the 6 flange nuts (on the cone washers) to 26 ft-lbs, I read somewhere that the FSM is mistaken and they actually meant 26 in-lbs (about 2 ft-lbs) instead, is that correct? It sounds reasonable considering the size of the studs those nuts are mounted on, just double checking..
Thanks for the help all along..
Cheers,
- I am using the LandTank preload method, which seems to be favourable by many Mudders and stood the test of time/trail.
To recap it:
- Torque adjusting nut to 45 ft-lbs
- Turn the hub left and right a few times
- Loosen the nut until can be turned by hand and repeat 1 & 2
- Torque the adjusting nut to 10 ft-lbs
- Install lock washer and lock nut
- Torque the outer lock nut to 45 ft-lbs
- Check the turning force with the fish scale between 8-12 lbs
- The FSM says to torque the 6 flange nuts (on the cone washers) to 26 ft-lbs, I read somewhere that the FSM is mistaken and they actually meant 26 in-lbs (about 2 ft-lbs) instead, is that correct? It sounds reasonable considering the size of the studs those nuts are mounted on, just double checking..
Thanks for the help all along..
Cheers,
