I'm having trouble with setting up my three on the tree it was a floor shift and am converting it back to three one the tree. I have all the linkage set up but am struggling with the slave cylinder set up with the motor mount and linkage. I have a 62 fj40 but using some later model parts. No later then 1967. Anyways. Looking for some pictures of what it should look like and how to mount the slave cylinder to the motor mount I have looked for feeds but can't find