My 12HT Ute build up (1 Viewer)

This site may earn a commission from merchant affiliate
links, including eBay, Amazon, Skimlinks, and others.

Awesome work mate. Gotta love what abit of paint can do eh , really freshen things up
 
Almost finish but on the road

10345538_10203139812689655_1945786967459482393_n.jpg


10252130_724763310921969_6826844043899318988_n.jpg
10354824_724763344255299_4426614616755332268_n.jpg

10342002_724763604255273_8625051444350268471_n.jpg

10370373_724763610921939_3650015766283140610_n.jpg

10301128_724763674255266_8901777564653345596_n.jpg
 
Excellent work there lightning, you have truly inspired me to do something with my spare 12HT, I don't know, but I am inspired :D
 
Do it spud! I wonder how a 60 would look as a fast back! :D
Nice work on the rig, bloody QLDers getting away with blue plates, that conversion is so expensive to engineer down here where the footy is won.
 
Mod plate for every thing was $250 to have the engineer to drive out and have a look how much would it cost in NSW.
 
Mod plate for every thing was $250 to have the engineer to drive out and have a look how much would it cost in NSW.

Easily $1200 once you get in and out of the shop, I think you need at least 3 inspections at the engineers shop or pay more for them to come out.
Initial inspection would be cut and design then the 2nd would be semi finished for weld inspections then 3rd paint and tray.
They may let you do design, cut and welds in the first inspection but you'd want to be sure your design was right.
 
absolutely beautiful. consider making xl posters and selling them. for inspiration in the shop, you know..... hahaha.
 
Awesome build, but I want to know more about your coil spring leaf spring helpers...do tell...
 

Users who are viewing this thread

Back
Top Bottom