Build ...and it starts...

This site may earn a commission from merchant affiliate
links, including eBay, Amazon, Skimlinks, and others.

had a brain storm about a half-hour ago, figgered out my install idea for reinforcing the inside frame rails for the spring mount area....

fortunately, a good day with the welder....expecially since I'm bent in half sitting under the truck and trying not to make a mess....
 
last for now....rear housing in primer. (rear cover I'm using is already in black....axle gets it next....)

Gotta order up some gaskets and such this week....think I might ring up Kurt Monday and add to my spares collection....
 
Very nice...............

That thing looks like it should perform very well.

Rob
Radd Cruisers
 
Looking good! When was the shakedown run?
 
the opening really doesnt' need to be that large....since the rope is tight when in use, it only contacts the drum. I actually "mostly" mimic'd the stock opening on my previous bumper (tho, this one is a 1/2" larger or so, to make sure there was no rubbing)
 
:flipoff2:

went for semi-gloss for the frame...primered last night, paint in the house staying warm. "most likely" get 'er topcoated Sat morning, tho may toss one on Fri evening before heading out for adult bevarages....
 
don't 'bout you people, but I have thrashed my rear diff drain plugs in every axle I own...so, this one got removed...this pic is of the replacement piece of 1/4", before trimming...everything else was ground/sanded down smooth.
 
didn't waste the whole day on trivial stuff tho....links are installed, springs are in, working on lower shock mounts now. This is what the finished look will be...."not quite" a 90 degree departure angle....88 maybe...
 
T-case/adapter still has to go in (frickin gaskets/seals didn't show on Friday...), driveshafts need to go on, plus the skid plate. Lower shock mounts are made and need to be welded on/painted. Brake lines need to be run and bled. I'm not gonna do a limit strap for the test run, wanna see how it works first without it.

Probably outta put locknuts on all the link bolts too....lol

Tomorrow morning is shock mounts and design of the brake work.

Today included building the rear axle, including a new welded set of spiders, rear brakes and new pads, and lots of little "tweaks" I knew i'd remember when I got started assembling, such as the removal of the bottom drain plug and adding a top-side filler hole and vent location.
 
shock tabs on this morning, couple other tweaks. these pics are the suspension fully drooped, tires just barely touching...
 
Back
Top Bottom