A journey with my boys- The Elf Barn as I call it. (4 Viewers)

This site may earn a commission from merchant affiliate
links, including eBay, Amazon, Skimlinks, and others.

Degreased, powerwashed, etched, powerwashed, squeegeed, drying.

Decided solid color 1part epoxy. Light grey. This weekend.

Also had our first visitor. Rat snake.
926EBA75-A4BC-4DBC-9CF0-0627194F5061.jpeg
FB99ED60-B88B-49A8-A15F-81B252546F3D.jpeg


75089035-92F1-4D61-BA58-1F37E3C95326.jpeg
 
Looks great!!!!
 
Dude, you got a forklift! Awesome. Once you have one you'll never be able to go without one!
 
Dude, you got a forklift! Awesome. Once you have one you'll never be able to go without one!

It’s like having 5 Olympic heavy weight lifters at the call off your ignition. Lots you can do if you are creative. Could not place a chain rail hoist in the new place. Needed something else. Got it for deal I could not refuse.
 
Laid down 1 part epoxy. Turned out good. Used a airless sprayer and :princess: followed up with a 3/8” nap roller. Like it more than the bare concrete. Much brighter inside.

FC739478-AC99-4857-BCA5-CC03E1C7BE9A.jpeg


6B3DBC51-3D1A-4176-A9EB-6FD4F72C0D2D.jpeg


D84E6E04-2DA0-4554-90EF-94F12CB8096E.jpeg
 
That looks great! Let it cure and fill the place up :).

That’s going to happen for sure🤣🤣🤣. So glad I learned Tetris early on in life. Sooooo valuable.
 
You should go 2 or 3 layers for the floor, it will brighten up even more and lasts much longer.
Especially with that fork lift.
It wil never be this empty again until you move to the next building.🤔
 
Worry about too thick where forklift tires have a mil thickness to bite and chew off. This is pretty thin and seated in the etched surface.
 
Hi @Ocho77. Thanks! We did the other half of the barn this weekend.

Time to move in!!

85898190-0EA3-4A37-AF6F-AE28063A27D2.jpeg
 
Two in

393CC6F0-3B3A-4884-B4EB-31AC130AC5C9.jpeg
 
Moving old barn into the new.

Axles for the builds we will be working on

F0A1AB1F-CD60-48B6-A059-AF9B915DF138.jpeg
D611E518-9F40-4C7F-85F8-C94FEDE21D7E.jpeg


Then 3 of 6 engines (spare 1fzfe, 351 Cleveland (numbers matching for the Mach I) and 2H. Next round will be 2 more 2H engines and and blue printed rebuilt 351 4 barrel.
FC0ABA28-30BC-4BF6-9D45-8AD428B59771.jpeg

7EB9738B-371E-41D0-BB5D-E7BB96328A2C.jpeg


the forklift sure can in handy. Best back surgery insurance.
 
:princess: Had some great ideas to reorganize the section with the bays so all four a available. We had some shelves on the end of the bay section that prevented full use. R2D2 did some of the heavy lifting. Things you dream up when the muscle is at beckon call. Best shop assistant ever.

Had to relocate the propane heater because shelves were going there. R2D2 was at beckon call

We also got blue bonnet to the barn.

Next is old Landy and Hercules.

The elves worked really hard.

20162B81-72D3-4376-8435-E3A57C7AD4BF.jpeg


B4CAF67A-0F67-400E-9500-C5DD9565A6F7.jpeg


9D33FEF2-5E23-4934-B0B7-FC29873FA597.jpeg
 

Users who are viewing this thread

Back
Top Bottom