- Thread starter
- #601
Passed inspection. I dropped a piece of 2" conduit into thw slab for some electrical and they poured on friday morning.
Turned out good. I kept a sprinkler on it this weekend to help water cure it. Ill run it a little more tomorrow, but think it should be good.
I spent most of today moving dirt. They piled it up in the yard and im trying to move it because they will have more to move and it will need to be out of the way. Stock piling it up front for other projects to be determined.
I also burned some brush and cleaned up around.
Trying to get some areas cleaned up around this place. Wet brush is no match for a little diesel fuel and motor oil....
Not sure when the trusses will be ready so not sure when the posts and framing will start, but hopefully we'll have an update later this week.
Turned out good. I kept a sprinkler on it this weekend to help water cure it. Ill run it a little more tomorrow, but think it should be good.
I spent most of today moving dirt. They piled it up in the yard and im trying to move it because they will have more to move and it will need to be out of the way. Stock piling it up front for other projects to be determined.
I also burned some brush and cleaned up around.
Trying to get some areas cleaned up around this place. Wet brush is no match for a little diesel fuel and motor oil....
Not sure when the trusses will be ready so not sure when the posts and framing will start, but hopefully we'll have an update later this week.