NicksFJ40
Doesn’t read post longer than two paragraphs.
- Thread starter
- #21
A couple updated pics. Construction is basically done, I still have to complete the bathroom and instal the boiler system. The Max Line air system is in but I would like to fabricate a 10-15' copper manifold between the compressor and filter which I have seen here on Mud. Max Line was easy to work with and is a quality product except for the plastic clips that hold the air line, I used plumbers tape to re-inforce them. I have some organizing to do, its amazing how fast it filled up.