For those who have access to a fabrication shop, which I do, this would seem to be the easiest and most cost effective caster correction:
First, drive truck to fab shop and walk Starbucks and read a book while the shop does the following:
1) Remove arms and press in new factory rubber bushings
2) Cut off the rear axle arm mounts on the front axle
3) Reinstall the arms at front axle mount and frame mount
4) Rotate the pinion down (only one axle mount remains so pinion will rotate freely) so that u-joints are in a normal offset position (not the stock "broken back" alignment), increasing caster along the lines of using the Slee arms on a 4" lift
5) With new pinion angle set, weld on new heavy duty rear mounts (still talking rear mounts on the front axle) one side at a time, drilling the bolt hole per the new pinion alignment (do one side of each mount at a time for proper bolt alignment using bushing sleeve as drill guide)
6) Repeat the mount fabrication on the second side.
I doubt that would be more than two hours of labor and a little bit of metal stock and welding, and you could set the pinion exactly plus gain a heavy duty front mount. No guesswork involved, much like rotating the knuckles. What am I missing?
Nay
First, drive truck to fab shop and walk Starbucks and read a book while the shop does the following:
1) Remove arms and press in new factory rubber bushings
2) Cut off the rear axle arm mounts on the front axle
3) Reinstall the arms at front axle mount and frame mount
4) Rotate the pinion down (only one axle mount remains so pinion will rotate freely) so that u-joints are in a normal offset position (not the stock "broken back" alignment), increasing caster along the lines of using the Slee arms on a 4" lift
5) With new pinion angle set, weld on new heavy duty rear mounts (still talking rear mounts on the front axle) one side at a time, drilling the bolt hole per the new pinion alignment (do one side of each mount at a time for proper bolt alignment using bushing sleeve as drill guide)
6) Repeat the mount fabrication on the second side.
I doubt that would be more than two hours of labor and a little bit of metal stock and welding, and you could set the pinion exactly plus gain a heavy duty front mount. No guesswork involved, much like rotating the knuckles. What am I missing?
Nay
Last edited:
lots of threads to read on this.