Things are slowly moving forward with the workshop. We still plan on breaking ground late spring, but also need to finalize design with the metal building company, and the civil is working on the slab design right now. Like everything else, this is taking longer and moving slower than expected.
My architect just asked if I wanted any floor drains in the shop. I was thinking of maybe just a narrow grate on the inside of each bay door, that runs the full width of the door. Should I do any more further in the shop? Also, should I just have these drain into a basin outside, or connect to my septic? I would try to keep oil/chemicals to a minimum on the floor before washing the floors. Well is 800'+ deep so I am not too worried about contamination.
Shop floor is 50'x84' with 4 large bay doors on the 84' side.
My architect just asked if I wanted any floor drains in the shop. I was thinking of maybe just a narrow grate on the inside of each bay door, that runs the full width of the door. Should I do any more further in the shop? Also, should I just have these drain into a basin outside, or connect to my septic? I would try to keep oil/chemicals to a minimum on the floor before washing the floors. Well is 800'+ deep so I am not too worried about contamination.
Shop floor is 50'x84' with 4 large bay doors on the 84' side.