Is this the "I can't friggin' wait!" thread?
To Do:
switch Master Cylinder (ugh)
install castor plates (ugh)
build some crapper pipe sliders (ugh, at least i got the steel)
switch out front 3rd members.... with one that has an ARB in it! (yeah!)
install locker compressor (ugh)
My to do:
Back F250 to garage and open tailgate and camper top(don't laugh, it's functional.)
throw all contents of garage at said functional truck.
close tailgate and hope most of what I need made it in the truck.
Fill truck with diesel
Drive
Can't freakin wait.
You know, he might well bring that thing again.....