Steering box, aluminum-bodied brake master cylinder, & the repainted brake booster installed.
New (unbroken) starter was installed on the LS:
We finished cleaning the build-up of grime (mix of mud, oil, and dust) off the transfer case. This was one of those times it would've been nice to have a water source for a pressure washer. But I'll take a climate controlled work space in the 100* weather over that.
I cleaned the layer of grime off the transfer case wiring as well. Just like the transfer case, there are signs of poor repair attempts from someone. If someone has an extra FJ80 or FZJ80 transfer case wiring harness sitting around, please DM me. Husband can work his magic on this if needed, but we would rather have a harness without broken connectors.
Pic of the passenger side shock tower with a coat of glossy high-temp paint to match the driver's side:
Next few steps will be installing the new torque converter in the transmission & mating up the engine, transmission, adapter, & transfer case. Our goal is to get the drivetrain the car & mock up the engine mounts.