Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
This site may earn a commission from merchant affiliate
links, including eBay, Amazon, Skimlinks, and others.
Man, you people with skills make me sick! Looks good.
TK
I also agree that once you start working on the things and put all the time, screw up's, tools required ect... it is no wonder why the other guys charge what they do for them. They are not easy to build at all.
Finish mine too please......
Darwalk/Vistataco,
Those sliders are looking great. Can you please tell me the length of the square tubes with 2"x 3"x 1/4" and the diameter plus length of the round tubes? Thanks.
Originally posted by Vistataco
The main 2X3 tube is 69".
With 69" inches long, do you think there will be enough room to fit the front mudflaps?
Looks like great materials and welding...
Still not sure about the frame legs being level. Why not triangulate to the frame.. Angle to the side of the frame rail flush with the bottom and angle again with another leg up to the top of the frame rail..
I like the triangular bracing used by hanna....
A friend of mine just bought a hydro exhaust press.. I wont need cat guards when we are thru er umm testing it to make my high ground clearance system..
Wont be needed on mine either.. Tucking high and going over the frame...