Adventure Teq
SILVER Star
So I'm looking at all my options for replacing my bad 1979 (or there abouts) Chevy 350. I basically want to drop in a carbureted one from the same era in order to minimize the hassle, and I'm just not a fan of computerized engines.
I will likely either get a reman/rebuilt one for $1100-$1700 but I'm really leaning more to this other option. I've called around and I could get a "good running" one from a salvage yard for $250-$400. Now what I'm thinking is that if I just get one of these that are still running and not damaged inside then go ahead and rebuild that one over the next little while I'll be ahead considering that it "shouldn't" need any major parts replacement or serious machine work. I'm thinking it would basically be just a tear down/cleanup/inspection and replacement of seals, gaskets, and use the same sized bearings and piston rings that came out of it as long as they are within spec. With some possible cylinder honing and maybe a valve grind.
So what do you think, does that sound reasonable and sound like it would last another 100000 miles? Or would I probably need to get it fully machined at the same time i.e. bored over, crank ground, rods ground, heads resurfaced, valve guides/seats replaced, ...oh... and new pistons and the whole nine yards? Because if the latter is the case then I'll just save the hassle and drop in a crate/locally rebuilt one and be back on the road within a week or so.
Just to clarify, my engine appears to have been rebuilt a number of times with numerous different engine parts to about the limit of it's rebuilding specs, so I'm done with this one and not even considering rebuilding it.
Thanks guys.
I will likely either get a reman/rebuilt one for $1100-$1700 but I'm really leaning more to this other option. I've called around and I could get a "good running" one from a salvage yard for $250-$400. Now what I'm thinking is that if I just get one of these that are still running and not damaged inside then go ahead and rebuild that one over the next little while I'll be ahead considering that it "shouldn't" need any major parts replacement or serious machine work. I'm thinking it would basically be just a tear down/cleanup/inspection and replacement of seals, gaskets, and use the same sized bearings and piston rings that came out of it as long as they are within spec. With some possible cylinder honing and maybe a valve grind.
So what do you think, does that sound reasonable and sound like it would last another 100000 miles? Or would I probably need to get it fully machined at the same time i.e. bored over, crank ground, rods ground, heads resurfaced, valve guides/seats replaced, ...oh... and new pistons and the whole nine yards? Because if the latter is the case then I'll just save the hassle and drop in a crate/locally rebuilt one and be back on the road within a week or so.
Just to clarify, my engine appears to have been rebuilt a number of times with numerous different engine parts to about the limit of it's rebuilding specs, so I'm done with this one and not even considering rebuilding it.
Thanks guys.


It doesn't get any easier than that! Good luck...Now all I have to do is find that deal up in New Hampshire!