- Joined
- Jan 12, 2008
- Threads
- 300
- Messages
- 3,610
- Location
- West MI near GVSU
- Website
- www.mcdesignsoffroad.com
Hey guys. I'm waiting for my wife's engine to be finished at the machine shop and have the opportunity to replace the rusted rear heater lines that blew two years ago leading to a major overheat and seized engine.
Last fall we rebuilt the head and I started bending 1/2" stainless lines. I'm looking at them now and wondering if they will flow enough hot fluid and if the winter temps will draw more heat from them than 5/8" or 3/4".
I have lots of tubing available at work, but only 1/2" and 3/4" benders.
Should I stay with the 1/2" or go 3/4"? My NAPA told me it would be easier to find jumper hoses that would go from the 3/4 to the ~16mm brass nipples on the truck.
Last fall we rebuilt the head and I started bending 1/2" stainless lines. I'm looking at them now and wondering if they will flow enough hot fluid and if the winter temps will draw more heat from them than 5/8" or 3/4".
I have lots of tubing available at work, but only 1/2" and 3/4" benders.
Should I stay with the 1/2" or go 3/4"? My NAPA told me it would be easier to find jumper hoses that would go from the 3/4 to the ~16mm brass nipples on the truck.