i can see how it could take that long to make....trust me R&D is not easy, if you build for production or for just one, it takes alot of time, templates,measurements and trial and error.
if you have specs and want to make a bit of royalties, let me know, i'd be willing to work with you on it
This is my second project welding so it took me a little longer than someone with real skills.
1st project was some sliders, still not 100% done but they are 98% done. Just need to cap off one side.
Luckily I had some good help.
I only had about 20 hours in it at that point.
Time include drawing, measuring, driving to and from metal shop, haggling to even get them to mess with me. They do very big jobs (think smoke stacks for power plants). I just had them do the big cuts and bends.
Here it is now with receiver hitch.
I started to put together all the parts I need to do the spare tire carrier and it just did not add up so I bought and old one off Lance at IPOR.
Just need to cut a hole, weld in the spindle and figure out the latch.
I'll post it here when it done.
At this point my total cost is right at $500.