CLC Tools and Shop Thread

This site may earn a commission from merchant affiliate
links, including eBay, Amazon, Skimlinks, and others.

I picked up a place in the country outside of S-Town. It came with it. Shop is new/nice. House is a complete redo.
VERY impressive!

(BTW: For anyone who intends to price out a metal building these days - and I'm talking about a METAL building, not brick, finished out, etc....just a METAL freaking building - be prepared to throw up)
 
VERY impressive!

(BTW: For anyone who intends to price out a metal building these days - and I'm talking about a METAL building, not brick, finished out, etc....just a METAL freaking building - be prepared to throw up)
m

Thx. And yeah I’m glad someone else took the hit on building this one...
 
VERY impressive!

(BTW: For anyone who intends to price out a metal building these days - and I'm talking about a METAL building, not brick, finished out, etc....just a METAL freaking building - be prepared to throw up)

I was pretty happy with what I paid. Seemed very fair.
 
1100 sq ft of closed cell foam. This place feels like the inside of a Yeti cooler now.
B46B0C21-31F2-4C8D-A63B-DE94B51CB96B.webp

Also got a place to put all my Cruiser parts. I’m going to put a shed cover in between and can park 3 more Cruisers :)

6D13A440-3DDC-4E7C-8D22-75F86C0B16A7.webp
 
It you don’t own these tools get them
C3E7E917-AE2D-4BD7-95A6-3EBDDA7E79A3.webp

9B843919-ED94-412C-9115-FA9FBC8BC158.webp

Outside door awning is up. All they doors are trimmed out. Walls are up. Tin goes in at the top next week and work benches installed and the main work will be done so I can start moving in

1B0E2726-748C-449D-BE6F-46A659DCA763.webp
 
I bought 4 high ceiling 250 watt LEDs. I saw some in a shop last week in Texas and they were crazy bright. About $180 each
Yeah, I was gonna say there are some really good BRIGHT LEDs out there these days.
 
These LEDs will literally blind you if you look at them.

www.hi-hyperlite.com



High Bay Light - Apollo Series
250W / 5000K / UL & DLC

Main shop is done. Time to move in.

Phase 2 will start once I gather up a bit more cash. I’ll be adding a 10x16 enclosed lean-to on the east side to store camping and shooting stuff to open up the space in my old shop.

A133DDF0-4796-4325-AE39-D6EAB5E86417.jpeg


48CE4E29-3399-4933-A729-57C0C0CA1C4E.jpeg


117FB53B-A4CD-4D34-847D-AF967DC732DA.jpeg


9EAAE86F-763D-46E7-AF8E-612AA6B5C438.jpeg
 
Info on the flags please.
 
Info on the flags please.

Drunkin Skull

 
Painted the white doors. Finished the TEQ mural. Hung Old Glory and now I’m scraping off the foam insulation as best I can that seeped out from inside. Thats my only complaint with this stuff.

9B12207F-2DBE-4AB6-89B4-1917FEB40D69.webp


C62EE742-D9A6-4C4D-A633-254480FB7382.webp


3211AE1E-D227-4E74-8415-F3B063663670.webp


CE471B1C-9433-410E-94DF-5E0A77E03561.webp


5E1C91F7-6ABE-4D85-B440-17B017BD855A.webp
 
Back
Top Bottom