Purchased a 97 with a rod knock. After calculating cost of a rebuild I decided to locate a donor engine. Finally Located a long block with only 43k miles out of a 94'. $1500 to my door. I have searched the threads and found bits of information, but not enough that I'm 100% comfortable with the swap. What all do I need to change for this engine to work in my 97? Scheduled to buy replacement engine this week so need information fast. Thanks!!
 
I personally would swap in a new head gasket on a engine stand before I stuff it.
But the parts that you will need the most, is the crank position sensor installed on the crank.
So to do this you will need to either buy a new reluctor(this goes on the crank) or dismantel the other engine and take the parts off it. You will need to remove both oil pans, remove the front timing cover(toyota recommends that you remove the head to do this). With the front timing cover off, swap in the new parts, install you have removed and then you will need to swap in the aluminum #1 pan off the 97 engine, with the new sensor. There are other threads on this that may be in more depth. So what else do you need? Be specfic in you questions. A FSM would be a great thing to have as well.
 
I'm not sure how fast you need to get this thing on the road, but retro-fitting the 94 to fit the 97 electronics is a little intensive. As powderpig said, the knock sensor is on the crank. You might not find a 95+ with that low of mileage, but with the durability of these engines, it's not that big of a deal to put a little higher mileage engine in there. Either way you go, I also recommend doing the head gasket while it's out, relocating the EGR VSV valve, and changing the PHH. It will be a lot easier to stick a 95+ in there, just plug and play!
 
besides the crank sensor you need an EGR temp sensor and there is additional valves for the pair system that you won't need and the harness for those valves isn't compatible. Also there was an upgrade to the chain slipper.

Like I said, strip it down to the block,crank and pistons and just move everything from the 97 engine over. That way you end up with everything you need. Lots of work though.
 
I am planning to do the obvious HG & PHH. What in talking about are the thins that have been mentioned like Oil pan and any other sensors that i would need to make the 94 run as the 97. the long block comes without accessories, so I will be transplanting all of that from the 97. I am assuming that all of that will tansfer straight across wihout issue. what I am concerned about most are the electrnics - Going from OBDI to OBDII. Is there anything else?
 
maybe I'm not being clear enough here, you would strip the donor engine down to the block, pistons and crank and take the parts off of the 97 and put them on that block.

the list of different parts from memory is as follows:

Upper oil pan - no crank sensor
upper intake plenum - no egr temp sensor
timing sprocket on crank - no allowance for crank sensor ring
crank sensor ring - none
DS engine mount - not tapped for intake brace
exhaust manifolds - setup for pair valve system
control valves under intake - has extra valve and wiring in harness so not compatible to 97

Since you need to swap out the timing sprocket and crank sensor ring and that requires you to remove the head and oil pans you are basically left with a block, pistons and crank which you would then mount everything back on. I suggest using all the 97 components as you are guaranteed to have a completely compatible engine in the end.
 
Hey thanks for the list Rick. -And thanks to the others who have responded. I have never torn down or rebuilt an engine before. But I think I'm to the point that I am ready to tackle it. I have some friends to who have and are going to help me. I just didnt want to leave something un done only to find out after the engine was installed. Though a 95-97 engine would be easier, this does give me the opportunity to get inside, examine and replace a lot of gaskets etc. which gives me piece of mind since I plan to own this one for quite a long time. I will have C Dan help me assemble new parts and no doubt continue to post on this thread for guidance as I go through the swap. Engine should be on its way this week.
 
Looks like you've made up your mind, but it sure seems like you could get a lot of rebuilding done on your old engine for $1400, especially if you tear it down and re-assemble it yourself. Essentially, you're looking at parts and machine work. What kind of costs did you come up with?
 
Last edited:
What scared me away from a rebuild was $2000 for machine work I didnt call around myself but in discussing the idea of rebuilding, 2 of my mechanic friends said they have that much into their engines in machine work and a third friend agreed that that seamed to be about right. Were they way off? engine has now been paid for.....
 
What scared me away from a rebuild was $2000 for machine work I didnt call around myself but in discussing the idea of rebuilding, 2 of my mechanic friends said they have that much into their engines in machine work and a third friend agreed that that seamed to be about right. Were they way off? engine has now been paid for.....

It's been awhile since I had some serious machine work done, so I have no idea what current costs are. Does seem high, though.

But what I was thinking is, take down the old engine and measure everything. Obviously you need to have the crank ground, that's a given with a rod knock. But often you can re-use the old pistons and not bother with boring out the old holes. It really does depend upon what you find when you measure them. If they're ovals, you gotta drill them out, then you're looking at some serious $$, but if they're within spec, go ahead and re-ring the pistons, hone the walls, grind crank, new bearing set, check the rods and re-size the one that was knocking, and clean up the head. Maybe a new chain. Clean block, new freeze plugs, and if you run synthetic from the get go, you're good for another 200K.

Do you have any idea of the history of the engine you're buying? It's awfully low miles for a 16 year old block. Has it been sitting for a decade? Or was it recently taken out of service. If the latter, I'd be checking the bottom end bearings. If you find an older engine that's been driven 2 miles to work and back each day, but no other use, that is the hardest miles on an engine. It will have low miles, but may have significant wear. 90% of engine wear occurs upon startup every morning, and until the temps come up there is greater wear then when they're all warmed up.

Not trying to scare you or anything, but if you can learn about the history that would be a good thing. If you can't, I'd be looking closely at both the rod and main bearings. Might as well since you gotta take the pans off anyway.
 
I've been tossing around the idea of offering a rebuild kit of sorts. A rebuilt short block, rebuilt head and a set of flow matched injectors in one simple package.

The buyer would just get the associtaed gaskets and swap over the remaining items from his engine and return the core.

What do you guys think of this service?
 
I've been tossing around the idea of offering a rebuild kit of sorts. A rebuilt short block, rebuilt head and a set of flow matched injectors in one simple package.

The buyer would just get the associtaed gaskets and swap over the remaining items from his engine and return the core.

What do you guys think of this service?

I would approve! :)
 
I've been tossing around the idea of offering a rebuild kit of sorts. A rebuilt short block, rebuilt head and a set of flow matched injectors in one simple package.

The buyer would just get the associtaed gaskets and swap over the remaining items from his engine and return the core.

What do you guys think of this service?

That sounds like a good idea! What would be the cost of shipping this coast to coast?
 
Basic machine work for the 1FZ here in the denver region is around 1100. 600 head work, 300 for boring, milling block to clean up is around 100, 100 to boil out all the aluminum bits.
Some place might be more, 2000 seems a bit high. Local machine shop prices vary at different locations.


One thought I had as well is to replace the timing Dampter with a new one. The older 1FZ had a brittle type of plastic on this, and can break rather easy.
 