I understand the price concern. Not targeting this response at you, Jon, just speaking generally. Teyes and others can spread engineering, tooling, software, manufacturing and support costs across tens of thousands of head units and hundreds of vehicle applications. We simply don’t have those economies of scale with a niche subset of 20-year-old land cruisers.
If somebody can build this to the same standard, at this volume, retail it for $500 and support it long-term, they’ve solved an economics problem I haven’t. If the right manufacturing partner comes along who can genuinely scale production, maintain the standard and materially lower the cost, I’d be very open to that conversation.
On the development side, in-vehicle testing is going extremely well. Since the first test, temperature synchronization, a runaway issue, mode display behavior, system on/off logic, AUTO behavior, and recirculation behavior have all been corrected/updated. Serial firmware loading has also been added through the controller for easier firmware updates and serviceability.
Testing is now down to very small edge cases. Things like an occasional missed temperature-knob detent, matching Toyota’s exact MAX COLD/MAX HOT behavior, and a subtle rhythmic flicker in the display when the headlights and factory dimmer are active. Things most owners might never even notice, but they are still being chased down because good enough isn’t the target.
The production harness is being worked through in much more detail now, including exact branch lengths so nothing is stretched or unnecessarily bundled behind the dash, along with proper protective sleeving/abrasion protection, strain relief and retention. The goal is for it to sit cleanly, stay secure, and survive years behind the dash without rubbing through, pulling on terminals or working itself loose.
On the mechanical side, a newly vapor-honed 3D-printed piece arrived today, and is being evaluated to push the prototype closer to a proper OEM-style appearance and texture.
As for timing, the goal is to finish the remaining tasks over the next couple months and move into the first production run this fall/winter... if production takes a little longer than planned, this becomes less of a product launch and more of a case study in how far one man can take a minor inconvenience.