- Joined
- Jul 6, 2003
- Threads
- 43
- Messages
- 133
I've read through all the tech links and looked at all the pictures I can get my hands on. My question is when welding the plate for the PS box (Saginaw) to the frame, do i first cut out the existing plate that's on the inside of the frame? I guess I could weld the new plate right over it, but I'm affraid of water getting in there over time and rusting from the inside out.
Some of the pictures look like the plate is acutally resesed into the frame. Like a 1/2" grove was cut out of the frame first... Is that what I saw or am I not seeing things right? If it is, is there any significant reason (i.e. alignment with the column)?
Also while I'm at it, I've been shopping around for the box. I got an email from carsteering.com and the guy said that the 800 4.25 turn boxes only have three mounting bolts...? That doesn't make sense to me. He said that they've done a lot of CJ conversions but used the 4 bolt older version. I asked him to clarrify because it's my understanding that there's a 4 bolt, 4.25 turn box floating around out there with my name on it.
Thanks,
Mike
Some of the pictures look like the plate is acutally resesed into the frame. Like a 1/2" grove was cut out of the frame first... Is that what I saw or am I not seeing things right? If it is, is there any significant reason (i.e. alignment with the column)?
Also while I'm at it, I've been shopping around for the box. I got an email from carsteering.com and the guy said that the 800 4.25 turn boxes only have three mounting bolts...? That doesn't make sense to me. He said that they've done a lot of CJ conversions but used the 4 bolt older version. I asked him to clarrify because it's my understanding that there's a 4 bolt, 4.25 turn box floating around out there with my name on it.
Thanks,
Mike