Detailed the rig today. Valve adjustment next month as fluids as needed.
Current plans:
Replaced headlights today
New brake light and bright bulbs
Washers for transfer case(no
Pop outs)
Rear bumper ad tire carrier
Modify sliders with round tube
Paint lower 1/4 and flares with paint matched linex/bed liner
Paint roof with white bed liner and seal rack holes
Repaint hood, door handles, mirrors.
New windshield (next week)
Valve adjustment
Evac and charge AC
Longer control arms and panhard
Longs and chromos
Modify skid plate
Longer drive shaft
FZJ brakes front and rear
Driveline brake
Current plans:
Replaced headlights today
New brake light and bright bulbs
Washers for transfer case(no
Pop outs)
Rear bumper ad tire carrier
Modify sliders with round tube
Paint lower 1/4 and flares with paint matched linex/bed liner
Paint roof with white bed liner and seal rack holes
Repaint hood, door handles, mirrors.
New windshield (next week)
Valve adjustment
Evac and charge AC
Longer control arms and panhard
Longs and chromos
Modify skid plate
Longer drive shaft
FZJ brakes front and rear
Driveline brake
Last edited: