I believe we have had some kind of partnership in the past with Andritz, but nothing for this job. Most of the components will be sourced and fabricated in the UK. The boiler will be coming from a US company, disc screen from a US company, and our feed screws will be built locally and shipped over there.
 
Nice picture of you hard at work. I can see the IH8MUD tab on the bottom of your screen! :grinpimp:
 
"live" camera of the job site action with time lapse movies over the last few months:

http://www.mwhglobal.reachtimelapse.co.uk/tyseley/

Not much to see now of any of our equipment being installed as the building now covers everything.

When the boiler arrives, which should be sometime in December, that should be interesting. It's massive and will require them shutting down streets, move signs/street lamps and all other sorts of things.
The main body of the boiler is 49' long x 17' tall x 13.5' wide, with a dry weight of 308,000 lbs. And it's coming all the way from Abilene, Texas.
 
So do you get to travel to these exotic locations?
 