On a 40, why did my 2 hour job take almost 10? Any helpful tips in case (God forbid), I have to do this again?
I think I should have let the penetrating oil soak longer. The hard part was when the tack welds on the nuts broke loose
and trying to line up the holes on installation. Is It common for thinks to get tweeked or fatigued enough to affect this?
I think I should have let the penetrating oil soak longer. The hard part was when the tack welds on the nuts broke loose