I went a little crazy, pulled all not perfectly strait studs and replaced, insulated with thickest solid foam board I could buy, should of vapoured the hole shower outside walls and inside but only did outside..
Concrete board on walls, siliconed bottom lip of board to tub flange, taped all joints with thin set. Schlutered systemed the entire inside as per instructions including corners.. .
Jumped a little ahead, plumbing was very strait forward.. purchased a crimping tool and did it all myself, very easy with all the new types of flexible line.. Lining up the drain with new tub was a bit of measuring and cutting, worked out..
.
Heated floor mats are great and easy to install also..
Rob
Concrete board on walls, siliconed bottom lip of board to tub flange, taped all joints with thin set. Schlutered systemed the entire inside as per instructions including corners.. .
Jumped a little ahead, plumbing was very strait forward.. purchased a crimping tool and did it all myself, very easy with all the new types of flexible line.. Lining up the drain with new tub was a bit of measuring and cutting, worked out..
.
Heated floor mats are great and easy to install also..
Rob

