- Thread starter
- #141
Shifter linkage is almost done. I've been going over to the machine shop a couple of evenings for the past couple of weeks and everything is almost done. Dad needed to get a couple parts tig welded and then it will be ready to throw on there. It's fairly bling.
Once that gets squared away we can throw the tranny tunnel back on and get the cage back on. I'm headed to b-ham tomorrow to pick up some Al beadlocks that I'm getting used. Also waiting to hear back from a guy in the local club to go pick up my 39.5" TSL's.
Once that gets squared away we can throw the tranny tunnel back on and get the cage back on. I'm headed to b-ham tomorrow to pick up some Al beadlocks that I'm getting used. Also waiting to hear back from a guy in the local club to go pick up my 39.5" TSL's.